Scope & Planning

We confirm staircase type, attachment points, and safe access/egress during work. Keep-safe finishes and paths are marked.

Protective Measures

Floors, walls, and railings are shielded. Work zones are sealed; HEPA filtration manages dust. Temporary access can be arranged where required.

Controlled Dismantling

Treads, risers, stringers, and landings are removed top-down. Components are lowered—not dropped—to protect surrounding areas.

Patch-Back Readiness & Handover

Anchorage points are made safe; clean edges are left for your installer. Metals/wood are recycled where possible; final sweep and note provided.