Scope & Method Plan

We verify wall types (gypsum, demountable partitions, glass), map keep-safe systems (sprinklers, cabling, HVAC), and plan phased work for offices, retail floors, and healthcare spaces to minimize disruption.

Protection & Controls

Full-height barriers, negative-pressure units, and HEPA filtration protect occupied areas. Paths/elevators are covered; life-safety devices remain active unless scheduled for isolation.

Dismantling Sequence

Walls, doors, frames, and trims are removed per scope with controlled cutting and fastener extraction to protect ceilings and floors. Adjacent tenants and shared corridors stay operational where feasible.

Waste Segregation & Handover

Metal and clean gypsum are separated for recycling where available; the area is vacuumed and broom-clean. We issue a brief closeout note detailing phasing and waste handling.