Scope, LOTO & Decon Plan

We document assets (tanks, mills, conveyors, mixers), set lockout/tagout (LOTO), and establish decontamination steps for residues per your EHS plan. Access, rigging points, and egress paths are mapped.

Protection & Controls

Work zones are segregated; spark/hot-work permits, ventilation, and spill kits are readied. Sensitive equipment and live operations nearby are shielded to minimize downtime.

Dismantling & Rigging

Assets are disconnected, drained, and sectioned as needed. Our rigging crew removes components using forklifts, dollies, skates, or cranes, coordinating with your OEM or maintenance team for specialty interfaces.

Load-Out, Waste & Handover

Metals go to recycling; residues and filters are handled per plan. Floors are broom-clean, penetrations made safe, and a completion note summarizes LOTO, waste streams, and serials (if requested).