Feasibility & Traffic Plan

Bridge type (steel, concrete, enclosed), utilities in the span, and proximity to roads/entries are reviewed. Lane closures and detours (often overnight) are coordinated with authorities.

Public Safety & Access

Barriers, netting, and overhead protection are installed. Spotters, signage, and radio comms keep pedestrians/vehicles clear of the work envelope.

Sectioning & Lifts

Connections are unbolted/cut in sequence; spans are lifted by crane or lowered in sections to a controlled zone for processing, avoiding façade/street impacts.

Load-Out, Recycling & Site Restore

Concrete/metal are segregated for recycling; haul routes minimize congestion. Openings are made safe/weather-tight; a completion report covers closures, lifts, and disposal.